PWR-30 modules selected after a six-month reliability trial; 180 k units shipped with lot-level traceability.
More from this section
Related
EV charging pilot, Canada
OPTO-12 gate drivers in a 22 kW prototype, with 8D support during thermal validation.
Industrial gateway, Netherlands
RF-24 plus isolated drivers for a DIN-rail gateway; alternate-source plan agreed for long lifecycle.
Wearable sensor, South Korea
ENV-6 calibration data integrated into the customer firmware, cutting production calibration time by